Southeast Loop
Location: East / west travel between SH 130 and FM 3349 and north/south travel to U.S. 79 in Precinct 4
Description: Williamson County conducted a study to consider connections for east/west travel between SH 130 and FM 3349 and north/south travel to U.S. 79. The schematic was completed in spring 2020, and right-of-way acquisition is underway. As part of the Southeast Loop Study, the FM 3349 at U.S. 79 project was identified and proposed due to the need for a grade-separated crossing over the Union Pacific Railroad and U.S. 79. For information on the FM 3349 at U.S. 79 project, see the FM 3349 at US 79 page.
Status: Construction of the first segment of the Southeast Loop began in summer 2021 and includes a new roadway with one lane in each direction and a center turn lane from CR 138 at Dana Drive to CR 137. The project also includes widening the existing CR 138 pavement to add a dedicated right-turn lane from westbound CR 138 to northbound SH 130 and resurfacing and restriping the pavement in front of the Lakeside Estates neighborhood. Funding for construction was secured through the voter-approved 2019 Road Bond. RTG is the designer and James Construction is the contractor. A groundbreaking ceremony was held on Wednesday, June 30, at The Bridge Church. Construction is anticipated to be completed in summer 2023. The CR 137 to CR 404 segment is under design and the County is actively pursuing construction funding.
Please note: The first phase of this project is a two to three-lane road with one lane in each direction and potentially a center turn lane, as shown on the Interim Schematics. As traffic requires, a second frontage road, which will create divided lanes for each direction, and main lanes will be added if the County continues to grow and the need arises.
Materials and Documents
- Fact Sheet (PDF)
- Growth at a Glance Fact Sheet (PDF)
- July 2, 2019 Email (PDF)
- May 29, 2019 Media Release (PDF)
- Open House Boards 6.24.19 (PDF)
- Open House Summary Report (PDF)
- Segment 1 July 23, 2021 Update (PDF)
- Southeast Loop Interim Schematic - SH 130 to CR 137 (PDF)
- Southeast Loop Interim Schematic - West of CR 134 to CR 404 (PDF)
- Southeast Loop Route 6.24.19 (PDF)
- Southeast Loop Ultimate Schematic - SH 130 to CR 137 (PDF)
- Southeast Loop Ultimate Schematic - West of CR 134 to CR 404 (PDF)
Please note: These are the ultimate roadway schematics. The first phase of this project is a two to three lane road: one lane in each direction and potentially a center turn lane, as shown on the Interim Schematics. Construction on the first phase of the frontage road is expected to begin late spring 2021 between SH 130 and CR 137. Future phases of construction will include the first phase, Interim Schematic, from CR 137 to the east. As traffic requires, a second frontage road, which will create divided lanes for each direction, and main lanes will be added if the County continues to grow and the need arises.
Public Involvement
Williamson County wants to hear from you, and public input is encouraged.
An open house was held on June 24, 2019. Comments from the open house were accepted through July 9, 2019. Materials from the meeting are available below.
For more information or to submit comments, please reach out:
- Email:Roads Department
- Call: 512-943-1195
- Mail: Public Information Office
710 S Main Street
Suite 101
Georgetown, TX 78626 - Updates: If you would like to receive email updates, please send an email to the Roads Department with "Southeast Loop Updates" in the subject line.