Location: Connector from Sam Houston Avenue at Patriot Way to SH 29
Description: The first phase of the project includes the construction of a two-lane road from Sam Houston Avenue at Patriot Way to SH 29 with a bridge over SH 130. Future phases to construct the ultimate buildout of the road could take several decades and will depend on growth and available funding.
Status: Williamson County launched the Corridor C Study in June 2017 to enhance safety and mobility by planning for a controlled access road from Sam Houston Avenue at Patriot Way to SH 29. The schematic was finalized in July 2019 after the County held two open houses in 2017 to gather input from the community as part of the study. Additionally, the project team analyzed environmental constraints, such as floodplains and historic properties, and minimized impacts to homes and businesses. The final archeological reports are anticipated to be completed in November 2023. The Construction Manual and plans were uploaded on to Bonfire on 7/24/2023 with bids due on 8/14/2023.
Construction is anticipated to start Fall 2023 and construction completion is anticipated for Summer 2026.
Contact: Email the Roads Department or phone 512-943-1195.
Materials and Documents
November 9, 2017, Open House Materials:
June 20, 2017, Open House Materials:
Williamson County Long-Range Transportation Plan