Location: Bagdad Road from Loop 332 to CR 281/Leander City limits
Description: The project includes the realignment and reconstruction of the existing two-lane road to a three-lane roadway, with a center turn lane and shoulders. A 10-foot trail (shared use path) will be included in the future to provide access and connectivity for bicyclists and pedestrians. When need arises and funding is available, two additional lanes may be added to meet traffic needs.
Status: Project design is underway by Binkley and Barfield, Inc. Plans are expected to be finalized in Late 2023. The project will go out to bid and be let in Spring 2024. Construction is anticipated to begin in Spring 2024 and last approximately two years.