Precinct 4
-
C. Bud Stockton Extension
The C. Bud Stockton Extension is part of the County's Long-Range Transportation Plan which aims to prepare for current and future growth by maintaining a high level of mobility and quality of life for all Williamson County residents.
-
Chandler Road Extension
Williamson County is conducting a study to develop a plan for the extension of Chandler Road east of SH 95.
-
Chandler Road
Proposed improvements would expand the current two-lane roadway to a controlled access facility with two mainlanes in each direction, three-lane frontage roads and access ramps on each side of the mainlanes.
-
Corridor C / SH 29 Bypass
The first phase of the project includes the construction of a two-lane road from Sam Houston Avenue at Patriot Way to SH 29 with a bridge over SH 130.
-
Corridor E5
The county is conducting the Corridor E Planning and ROW Preservation Study as part of a planned ultimate controlled-access roadway in the central part of the county as an alternative north/south transportation corridor to IH 35.
-
CR 101
This project reconstructed an existing two-lane roadway.
-
CR 129
The project will adjust roadway elevation to address sight-distance issues.
-
CR 314
-
CR 332
-
CR 366 Widening
-
FM 1660 (PTF)
-
FM 3349 at US 79
-
Granger Project
-
Kenney Fort Boulevard
The City of Round Rock and Williamson County have partnered together for design and construction of a six-lane divided arterial roadway.
-
Ronald Reagan Boulevard Extension Planning
Williamson County is conducting a study to develop a plan for improvements for Ronald Reagan Boulevard between IH 35 and SH 95, referred to as Corridor D.
-
Southeast Loop
-
Southwest Taylor Improvements
-
University Boulevard Expansion