Precinct 2
-
Corridor F / US 183
Go over various documentation and updates on the Corridor F project.
-
Corridor I-1
The first part of the Planning and ROW Preservation Study was completed for a new 1.6 mile-long roadway between U.S. 183 to Ronald Reagan Boulevard with proposed interchanges at each end.
-
Corridor I-2
The Corridor I-2 Planning and Right-of-Way (ROW) Preservation Study considers connections for travel between U.S. 183 and SH 29.
-
CR 200
CR 200 is being reconstructed to a two-lane roadway with a center turn lane and shoulders (3 lanes of an ultimate six-lane roadway) from CMTA Railroad to CR 201.
-
CR 201
CR 201 will be reconstructed as a two-lane roadway with shoulders. Additional lanes are expected to be added in later phases once growth necessitates and funding is available for improvements.
-
CR 258 Extension (US 183 To Sunset Ridge Drive)
The project will construct a new two-lane roadway facility from U.S. 183 to Sunset Ridge Drive and will include a connection to Questa Trail.
-
CR 279 / Bagdad Road (Loop 332 to CR 281 / Leander City Limits)
The project includes the realignment and reconstruction of the existing two-lane road to a three-lane roadway, with a center turn lane and shoulders.
-
Liberty Hill Bypass
The project will construct a new two-lane roadway from RM 1869 to CR 279 / Bagdad Road.
-
RM 2243 (Hero Way)
The proposed project would reconstruct and widen the existing rural two-lane roadway to a controlled-access highway which includes two main lanes in each direction separated by a concrete barrier, with direct connections to 183A, Ronald Reagan Boulevard and Southwest Bypass.
-
Ronald Reagan Corridor Planning
The County is planning for the future corridor of Ronald Reagan Boulevard between RM 2243 and I-35, which is expected to be an ultimate eight-lane controlled-access roadway.
-
Ronald Reagan Widening
This project includes making the existing road northbound only and building separate two lanes to act as a second frontage road, which will be southbound only.
-
Seward Junction Loop North
The project will provide a loop to drive north and around the SH 29 and U.S. 183 intersections.