Precinct 1
-
Anderson Mill Road Extension
The County is studying the area for an extension of Anderson Mill Road from FM 734 to Loop 1 to identify environmental constraints and potential alignments.
-
Corridor H / Sam Bass Road
Williamson County is planning to widen Sam Bass Road between RM 1431 and Wyoming Springs Drive to enhance safety, improve mobility, and meet current and future traffic needs as the county continues to grow.
-
Hairy Man Rd / Brushy Creek Rd Safety Improvements
This project is 2.2 miles in length and includes safety improvements between Brushy Bend Drive and Sam Bass Road.
-
IH 35 Corridor Operational Analysis
This project is an operational study for Williamson County and the City of Round Rock.
-
Great Oaks Drive Bridge at Brushy Creek
Bridge replacement over Brushy Creek on Great Oaks Drive.
-
Kenney Fort Boulevard
The City of Round Rock and Williamson County have partnered together for design and construction of a six-lane divided arterial roadway.
-
Pond Springs Drainage Study
Developing design to mitigate drainage along the Pond Springs Road Corridor.
-
RM 620 Overpass at Railroad / Chisholm Trail Project
The City of Round Rock, TxDOT, and Williamson County are partnering together on this project on RM 620 to add overpasses at Chisholm Trail and Lake Creek Drive, a roundabout at RM 620 and Chisholm Trail beneath the new overpass, widened lanes, new frontage roads, and will improve bicycle and pedestrian accommodations.
-
RM 620 / SH 45 Intersection to McNeil
The County is studying the area for an extension of RM 620 from the intersection of RM 620 / SH 45 to McNeil Road to identify environmental constraints and potential alignments.
-
University Blvd Widening
This 0.7 mile project includes the design and reconstruction of University Boulevard to a six-lane, median divided arterial section including intersection improvements with dual turn lanes at Oakmont and University Oaks.